Skip to main content

Help us improve the Digital Marketplace - send your feedback

SOFTCAT PLC

Cloud Gateway Secure Connectivity Platform

Cloud Gateway is a UK managed network and security platform that delivers resilient connectivity and modern security outcomes through a unified control plane, productised service tiers, and automation-led operations. As a secure transit broker and trusted public sector provider we hold Cyber Essentials Plus, ISO27001 and ISO9001 accreditations.

Features

  • Connect: High performance connectivity to cloud, HSCN, PSN and internet.
  • Connect: WAN/SD-WAN, Remote Access, Data Centres, and Crown Hosting.
  • Protect: NGFW firewall protection for customer endpoints and branch sites.
  • ZTNA: Connect to private applications without exposing the network.
  • SWG: Secures and filters all user internet traffic.
  • WAF: To protect public-facing web applications from attack.
  • Management options: Fully managed or co-managed support available.
  • Scalability: Flexible bandwidth and user volume options.
  • External integration: SIEM /SOC integration for continuous monitoring and analysis.
  • Core Connect & Transit-Only Connectivity.

Benefits

  • Flexibility: Modular, elastic cloud platform enables scaling without penalty.
  • Speed: Infrastructure-as-Code automation deploys and update products in minutes.
  • Security: Protect your network, users, devices and data
  • Support: Get away from inflexible contracts typical of traditional vendors.
  • Sovereign: Everything runs within the UK. Trusted by public sector.
  • Observability: Gain visibility of network security traffic and security events.
  • Compliance: Underpinned by best practice standards and accreditations.
  • Roadmap: An active development roadmap with new features launching regularly
  • Simplification: Reduce cost, complexity with single vendor integrated service.
  • Expertise: Access to qualified cloud networking and security professionals.

Pricing

  • Education pricing available
  • Free trial available

Service documents

Request an accessible format
If you use assistive technology (such as a screen reader) and need versions of these documents in a more accessible format, email the supplier at psitq@softcat.com. Tell them what format you need. It will help if you say what assistive technology you use.

Framework

G-Cloud 15

Service ID

5 0 2 4 2 5 6 6 9 5 6 8 3 6 3

Contact

SOFTCAT PLC Public Sector Tenders
Telephone: 01628 403403
Email: psitq@softcat.com

About your service

Service categories

Systems Infrastructure Software

Network

Network infrastructure software

  • Network application delivery
  • Software-defined networking (SDN)

Network management

  • Network performance management (NPM)
  • Network operations management (NOM)
Multi cloud support
Yes

Service scope

Software add-on or extension
No
Cloud deployment model
  • Public cloud
  • Private cloud
  • Community cloud
  • Hybrid cloud
Service constraints
No
System requirements
  • IPSec VPN connections: End user device capable of IP connectivity
  • SSL VPN connections: An operating system supporting SSL VPN software
  • Data Centre Connectivity: Presence in the same UK Data Centre(s)
  • Other requirements may depend on the specific solution

User support

Email or online ticketing support
Yes
Support response times
Standard support in business hours (Monday-Friday 09:00-17:30 excluding Bank Holidays). Priority 1 incident response within 1 hour.
Premier support 24x7 Priority 1 incident response. Priority 1 incident response within 15 minutes.
User can manage status and priority of support tickets
Yes
Online ticketing support accessibility
WCAG 2.2 AA
Phone support
Yes
Phone support availability
24 hours, 7 days a week
Web chat support
No
Onsite support
Yes, at extra cost
Support levels
Standard support in business hours (Mon-Fri 09:00-17:30 excluding Bank Holidays). Priority 1 incident response within 1 hour, resolution within 4 hours.

Premier support 24x7x365 P1 incident response. Priority 1 incident response within 15 mins, resolution within 2 hours. Monthly Service reports and review meetings.

Up to 5 days onboarding support included.

Our service desk is ITIL aligned. We have been awarded level 3 for continual improvement in our ITIL maturity assessment, demonstrating commitment to quality support and service delivery.

All customers receive access to the Cloud Gateway portal which provides visibility of their network and security ecosystem, including:
- Dashboard
- Network connectivity status
- Licence utilisation data
- Bandwidth usage
- Firewall policy information if applicable
- Support / ticket management
Support available to third parties
Yes

Onboarding and offboarding

Getting started
To ensure we design and build the right platform that fits your needs, our pre-sales team will work with you to understand your requirements and draw up a proposal. When the proposal has been signed off by you, our service delivery team will hold a kick-off session with you to plan the onboarding process. At this point we will ask you to provide some information which will vary depending on the nature of your deployment. Once all this information is received, we'll complete the technical deployment, test connectivity and security policy is working, before passing to you for a period of acceptance testing and sign off. As soon as you sign it off, we'll enter live service for the length of your contract term.
Service documentation
Yes
Documentation formats
PDF
End-of-contract data extraction
The nature of our service is connectivity and security services. Customers need not extract data when their contract ends in this regard. However, in accordance with our Data Retention policy, at the end of a contract, or upon request from the customer where retention is not required by law, we will delete data associated with the customer account.
End-of-contract process
At the end of the Term, the Buyer has the opportunity to renew the service or end the contract.

If the decision is to renew, we will review the services required by the Buyer and provide a new proposal to either maintain or change current services. A new contract or an extension notice will be created for sign off by the parties.

If the decision is to end then the Buyer has to provide notice in accordance with the contract and has two options:
1 – The contract end date is confirmed with the Buyer and the service and billing termination will align to that date
2 – We work together to agree an exit plan to migrate the services to another supplier. Any extension to our services or additional requirements during the transition period will be chargeable at our day rates.
For either option, we will agree an offboarding plan with the Buyer.
Documentation accessibility standard
None or don’t know
How the documentation is accessible
Our onboarding documentation meets WCAG 2.1 AA, facilitated by the third party form provider. Offboarding is managed via local materials and is not currently WCAG 2.1 AA compliant.

Using the service

Web browser interface
No
Application to install
Yes
Compatible operating systems
  • MacOS
  • Windows
Designed for use on mobile devices
Yes
Differences between the mobile and desktop service
Mobile devices such as laptops are supported and experience similar service as desktop users depending on service and configuration.
Service interface
Yes
User support accessibility
WCAG 2.2 AA
Description of service interface
Using the web interface - When the service goes live, you will be given login details to access our customer portal, My Cloud Gateway. Through My Cloud Gateway, you can access reports and real-time analytics for your network connections and security events. My Cloud Gateway also provides a ticketing function, allowing you to speak directly to our support team to make a request or raise an incident. New features and functionality are added to My Cloud Gateway regularly to improve user experience.
Accessibility standards
WCAG 2.2 AA
Accessibility testing
Automated testing completed annually
API
No
Customisation available
Yes
Description of customisation
The My Cloud Gateway customer portal is not customisable. However, the connectivity services are.

Cloud Gateway’s PRISM connectivity and security portfolio delivers tailored solutions for modern business networks. Business Connect services provide private, high-performance connectivity to public clouds, HSCN, and PSN with scalable bandwidth and multi-cloud support. Business Everywhere solutions include DC Interconnect for high-speed data centre and hybrid cloud connectivity, Remote Access via secure SSL VPN or ZTNA with identity integration. WAN/SD-WAN services feature dedicated circuits with managed CPE for integrated connectivity and security.

Security services encompass Managed Firewall with granular traffic control, IDS/IPS, anti-virus, and Deep Paacket Inspection. Secure Application Access (WAF) protects web applications and APIs against OWASP threats, bots, and DDoS attacks using AI/ML detection and zero-day prevention. Secure Internet Access (SIA) safeguards endpoint connectivity through URL/DNS filtering, anti-malware protection, application controls, and SSL/TLS inspection.

Customisable features include scalable security services, bandwidth allocation, security policies, and connectivity integration. Customers access a dedicated portal or account manager for service management, enabling flexible deployment and continuous optimisation.

Scaling

Independence of resources
We enforce customer segregation by using dedicated tenancies. This ensures that a customer's Cloud Gateway service is not affected or shared by other users.

Analytics

Service usage metrics
Yes
Metrics types
Metrics types
HTTP request and response status
Network
Number of active instances
Reporting types
  • Real-time dashboards
  • Regular reports
  • Reports on request
Resource tagging
No
FOCUS resource tagging
No

Resellers

Supplier type
Reseller (no extras)
Organisation whose services are being resold
Cloud Gateway

Staff security

Staff security clearance
Conforms to BS7858:2019
Government security clearance
Developed Vetting (DV)

Asset protection

Knowledge of data storage and processing locations
Yes
Data storage and processing locations
  • United Kingdom
  • European Economic Area (EEA)
User control over data storage and processing locations
Yes
Datacentre security standards
Complies with a recognised standard (for example CSA CCM version 4.0)
Penetration testing frequency
At least once a year
Penetration testing approach
‘IT Health Check’ performed by a CHECK service provider
Protecting data at rest
  • Physical access control, complying with another standard
  • Encryption of all physical media
Data sanitisation process
Yes
Equipment disposal approach
A third-party destruction service
Data sanitisation type
Deleted data can’t be directly accessed / Cryptographic Erasure

Data importing and exporting

Data export approach
We are a secure connectivity provider and therefore users are not required to export data from our services. However, an online portal is provided whereby users can export their own:
traffic logs
network map
routing tables
firewall rules
proxy settings
Data export formats
CSV
Data import formats
CSV

Data-in-transit protection

Data protection between buyer and supplier networks
IPsec or TLS VPN gateway
Data protection within supplier network
IPsec or TLS VPN gateway

Availability and resilience

Guaranteed availability
99.95% service availability across Cloud Gateway infrastructure to the customer site, not necessarily to the user as they may be connecting via other connectivity methods. Service credits are applicable if Cloud Gateway breaches its Availability SLA - based on the infrastructure that is within Cloud Gateway's control.
Approach to resilience
Our service is built using overlays inside a highly resilient hybrid cloud architecture. Consequently each component, each set of components, each stack and each full tenancy is designed to be resilient at multiple points. This is achieved in its simplest form by having more than one of each component part available (akin to traditional High Availability), but also by leveraging cloud resilient functions such as Multiple Availability Zones, Multiple Regions, or both.
Outage reporting
Our service sends alerts to our monitoring and engineering teams to inform them of any potential outages. The issues are sanitised to see if they require manual intervention by our team, or whether automatic recovery has occurred. If manual intervention is required then a proactive alert ticket is raised within our IT Service Management system (ITSM). These tickets can be viewed by the customer at any time. Email alerts can additionally be created and sent to approved recipients for any incident relating to an outage.

Identity and authentication

User authentication needed
Yes
User authentication
  • Multi-Factor Authentication (MFA)
  • Identity federation with existing provider (for example Google Apps)
  • Dedicated link (for example VPN)
  • Username or password
  • Other
Other user authentication
Other user authentication

The exact configuration depends on the specific product/service (see Service Categories above), and can be tailored depending on customer requirement. 2FA, identity federation, dedicated link and password and username can be used for authentication. For example, for our Remote Access product, users require authentication before they can access the service. Customers are able to define whether MFA is required for Remote Access at an organisational level.
Access restrictions in management interfaces and support channels
Our service has a robust set of multi-layered security functions at its core. Access to and from any service is managed, maintained and enforced in line with customer approved policy but also in line with access control procedures, such as following the principle of least privilege and adhering to the need-to-know, role-based access control methodology.
Access restriction testing frequency
At least once a year
Management access authentication
  • Public key authentication (including by TLS client certificate)
  • Dedicated link (for example VPN)
  • Username or password
  • Other
Description of management access authentication
Other: The exact authentication method depends on the systems in use, which varies between product/service. At all times, a VPN connection (provided on a role-based access control basis and authenticated by SSO) is required to firstly gain access into the management areas to encrypt the connection and control the users that have access to the network. From here, both certificate based authentication and password based authentication is utilised.

Audit information for users

Access to user activity audit information
Users contact the support team to get audit information
How long user audit data is stored for
Between 1 month and 6 months
Access to supplier activity audit information
Users contact the support team to get audit information
How long supplier audit data is stored for
At least 12 months
How long system logs are stored for
At least 12 months

Security governance

Named board-level person responsible for service security
Yes
Security governance certified
Yes
Security governance standards
  • ISO/IEC 27001
  • Other
Other security governance standards
2, 3:
CyberEssentials
CyberEssentials PLUS
ISO 9001
ISO 14001
ITIL Level 3 Continual Service Improvement
Information security policies and processes
We have been ISO 27001 certified since 2020 and are certified for CyberEssentials and CyberEssentials PLUS. We additionaly conduct internal audits every year.
Our service and operations undergo annual review and comply with frameworks including PSN, HSCN, and NCSC Cloud Security Principles.
Security is embedded via mandatory annual training, targeted professional development and technical controls that our employees work within every day. Adherence to controls and our policies is enforced via signed Employee User Agreements (Acceptable Use), which reserves the right to take disciplinary action for violations.
Quarterly management reviews report KPIs to the Senior Leadership Team. An annual governance audit verifies compliance and is reported to the Board. The Board also receives monthly security risk exposure reports.
Software Security Code of Practice
Yes

Operational security

Configuration and change management standard
Supplier-defined controls
Configuration and change management approach
We practise an ITIL aligned change management process for all changes to our production systems/services. Changes are raised within our ITSM system for auditing and this system contains configurations, service components and CI mappings.

We have Standard changes that are pre-approved, low-risk changes that follow standardised templates and do not require CAB approval.

Normal changes require, as per ITIL standards: peer review, implementation plan, test plan, scoping and risk assessment (which includes security impact). Normal changes are reviewed by CAB.

Emergency changes must only be used in critical situations and be approved by 2 members of the CAB before implementation.
Vulnerability management type
Supplier-defined controls
Vulnerability management approach
We proactively identify, log and track new vulnerabilities. Potential threats are assessed through live monitoring within our platform. Using industry-standard tools, we conduct vulnerability scans across the platform to test, track and confirm patch deployments and test security configurations. Scans are performed daily on critical assets and no less than weekly elsewhere across the platform. We also consume information on possible vulnerabilities through various threat intelligence feeds. Any high profile/risk vulnerabilities which require prompt action will be treated as an incidents under the incident management process. Patches are deployed manually or via automatic updates into our cloud infrastructure.
Protective monitoring type
Supplier-defined controls
Protective monitoring approach
We identify potential compromises through live monitoring and alerting on our platform. Our monitoring and alerting rules are based on the AWS CIS Foundations benchmarks with additional controls and alerts for any non AWS infrastructure. These events are sent to our SIEM where alarms are triggered based off a set of configured rules.

Depending on the severity/activity, the event may be treated as an incident and response plans activated in line with the incident response procedure.
Incident management type
Supplier-defined controls
Incident management approach
We operate a robust, ITIL based Incident Management process within our end to end support model. We have extensive monitoring, configured to proactively identify potential issues and mobilise internal teams for prompt investigation and resolution. Users can report incidents via the My Cloud Gateway portal, by email or by phone. In cases where a major incident has been identified, our major incident process is utilised and email communications are issued to affected users, providing them with regular status updates throughout the incident lifecycle.
Post-quantum cryptography secure
No

Secure development

Approach to secure software development best practice
Independent review of processes (for example CESG CPA Build Standard, ISO/IEC 27034, ISO/IEC 27001 or CSA CCM v4.0)

Public sector networks

Connection to public sector networks
Yes
Connected networks
  • Public Services Network (PSN)
  • Health and Social Care Network (HSCN)

Pricing

Discount for educational organisations
Yes
Free trial available
Yes
Description of free trial
We can, at our discretion, provide a proof of value. This will consist of a configurable, dedicated SASE platform for a set period of time with defined outcomes, to test connectivity and establish your business needs. If technical consultancy is required, this is chargeable at the prevailing daily rate.

Discount percentage by annual call-off contract value (excluding VAT)

Less than £250,000
0%
Between £250,000 and £500,000
0%
Between £500,001 and £1,000,000
0%
Between £1,000,001 and £2,500,000
0%
Between £2,500,001 and £5,000,000
0%
Over £5,000,001
0%

Non-mandatory Standards and certifications

ISO/IEC 27001 certification
Yes
Who accredited the ISO/IEC 27001
NQA
ISO/IEC 27001 accreditation date
Monday 8 April 2024
What the ISO/IEC 27001 doesn’t cover
N/A
ISO 28000:2022 certification
No
ISO 9001 certification
Yes
Who accredited the ISO 9001 certification
NQA
ISO 9001 accreditation date
Monday 8 April 2024
What the ISO 9001 doesn’t cover
N/A
Quality management systems (QMS)
Yes
CSA STAR certification
No
PCI certification
Yes
Who accredited the PCI DSS certification
SecurityMetrics
PCI DSS accreditation date
Friday 10 January 2025
What the PCI DSS doesn’t cover
N/A
Cyber essentials
Yes
Please provide your Cyber Essentials Certificate Number
E9fd5f85-7cd1-4ff2-aba9-6f9f5f225b1b
Cyber essentials plus
Yes
Please provide your Cyber Essentials Plus Certificate Number
181966c9-f0aa-42ed-9271-d1b111bdf43b
Other security certifications
Yes
Any other security certifications
Security Standards dependant on the vendor solution

Social value

Section B - Commitment for Future: Delivery
  • Mission: Kick start economic growth. To secure the highest sustained growth in the G7 - with good jobs and productivity growth in every part of the country making everyone, not just a few, better off.

    Policy Outcome 1: Fair work: That offers fair wages and good working conditions. Help people get a job, stay in work, and progress in their careers, with good employment opportunities across the country. Notes: Where there is a large proportion of labour costs in the contract, commercial teams should consider MAC in Outcome 1 as a priority

    • New apprenticeships on the contract workforce in the relevant area that meet the criteria set out in MAC 1b
    • Providing opportunities for, and measuring and monitoring of, staff workforce conditions over time, including employee engagement, involvement in decision-making and satisfaction and adapting to any changes in the results, with clear processes for acting on issues identified
    • Plans to engage the contract workforce in deciding the most important workplace issues to address
    • Ensuring new workers are informed of their right to join a trade union
    • Monitoring of employee engagement rates (by protected characteristic) and, where necessary, the development of actions to ensure all voices are heard across the diversity of the workforce
    • Employment contracts that reflect actual hours worked; steps taken to ensure employees understand their contracts and have the ability to review and adjust them if actual hours regularly exceed contracted hours
    • Activities that support an environment where staff are educated about, and feel empowered to, address their physical wellbeing
    • Activities that support an environment where staff are educated about and feel empowered to report and address bullying and harassment
    • Offer a pay and leave entitlement to all eligible staff who become kinship carers, ideally equivalent to statutory adoption pay and leave
    • Payment of more than the National Minimum Wage or National Living Wage (as appropriate) to the contract workforce
    • Monitoring and reporting of gender and ethnicity pay gaps and plans to address them where necessary
    • Entitlement to sick pay for the contract workforce, with provision in place for any staff who do not meet the earnings threshold for statutory sick pay, payment of sick pay from day one of absence and payment of staff on the contract workforce who are off sick a replacement income of 100% of their usual earnings for as long as possible
    • Plans for an appropriate income replacement policy for staff who are required to spend time away from work to care for a sick dependent or close relative
    • Understanding of in-work progression issues affecting the market, industry or sector relevant to the contract, and in the supplier’s own organisation and those of its key sub-contractors
    • Measures to support in-work progression to help people in the contract workforce, to move into higher paid work by developing new skills relevant to the contract
    • Support for the contract workforce by providing career advice, and providing opportunities for staff working on the contract with in-work progression career development into known skills shortages or high growth areas
    • Support for educational attainment relevant to the contract, including training schemes that address skills gaps and result in recognised qualifications
    • Volunteering opportunities for staff
    • Understanding of the modern slavery risks and issues affecting the market, industry, sector or country (of origin or of source) relevant to the contract, and the workforce in the supplier’s own organisation and those of its key subcontractors
    • Outline policies and practices to be applied to or put in place for the contract to mitigate and manage modern slavery risks, including: Pre-employment checks, recruitment practices. Workplace conditions, safeguarding plans and processes in place and regular monitoring with relevant groups considered, which may include sampling
    • Means of influencing staff, suppliers, customers, communities and/or any other appropriate stakeholders with respect to modern slavery risks relating to the contract
  • Mission: Kick start economic growth. To secure the highest sustained growth in the G7 - with good jobs and productivity growth in every part of the country making everyone, not just a few, better off.

    Policy Outcome 2: Skills for growth: Supporting growth sectors and addressing skills gaps.

    • Understanding of employment and relevant skills issues, and of the education and training issues relating to the contract. Illustrative examples: demographics, skills shortages, new opportunities in high growth sectors, geographic/local community and skills/employment challenges
    • Support for educational attainment relevant to the contract, including training schemes that address skills gaps and result in recognised qualifications
    • Activities to support relevant sector related skills growth and sustainability in the contract workforce. Illustrative examples: careers talks, curriculum support, literacy support, safety talks and volunteering
    • Delivery of apprenticeships, supported internships and T Level industry placement opportunities (Level 2, 3 and 4+) in relation to the contract
  • Mission: Kick start economic growth. To secure the highest sustained growth in the G7 - with good jobs and productivity growth in every part of the country making everyone, not just a few, better off.

    Policy Outcome 3: Resilient, innovative and flexible supply chains: Support economic growth through enabling resilient businesses, opportunities for small businesses and voluntary, community and social enterprises

    • Understanding of the types of businesses in the market and the level of participation by new businesses, entrepreneurs, start-ups, SMEs, VCSEs and mutuals
    • Activities to identify opportunities to open up sub-contracts under the prime contract to a diverse range of businesses, including new businesses, entrepreneurs, start-ups, SMEs, VCSEs and mutuals
    • Plans for engaging a diverse range of businesses in engagement activities prior to appointing subcontractors (including activities prior to award of the main contract and during the contract term)
    • Ensuring accessibility to contracting and subcontracting opportunities for disabled business owners and employees
    • Support for community-led initiatives relevant to the contract. Illustrative examples: improving transport links; reducing loneliness; helping with English language proficiency; and facilitating social mixing among people with different backgrounds
  • Mission: Make Britain a clean energy superpower: To cut bills, create jobs and deliver security with cheaper, zero-carbon electricity by 2030, accelerating to net zero

    Policy Outcome 4: Sustainable procurement practices: Reducing carbon footprints, minimising waste, and promoting the use of clean energy and green technologies.

    • Understanding of opportunities for additional environmental benefits delivery in the performance of the contract, including working towards net zero carbon emissions and use of clean energy and green technologies
    • Collaborative ways of working with the supply chain to deliver additional environmental benefits in the performance of the contract, including working towards net zero carbon emissions and use of clean energy and green technologies
    • Delivery of additional environmental benefits through the performance of the contract, including working towards net zero carbon emissions and use of clean energy and green technologies
    • Understanding of how to influence staff, suppliers, customers, communities and/or any other appropriate stakeholders through the delivery of the contract to support climate and nature protection and improvement
    • Activities to reconnect people with the environment and increase awareness of ways to protect and enhance it
  • Mission: Break down barriers to opportunity: By reforming our childcare and education systems, to make sure there is no class ceiling on the ambitions of young people in Britain

    Policy Outcome 6: Employment and training: For those who face barriers to employment

    • Understanding of employment and skills issues, and of the skills and employment shortages of high growth sectors relating to the contract
    • Creation of employment opportunities particularly for those who face barriers to employment, such as prison leavers, care leavers and/or who are located in deprived areas, and for people in industries with known skills shortages or in high growth sectors
    • Delivery of training schemes and programmes to address any identified skills gaps and under-representation in the workforce for the contract (e.g. prison leavers, care leavers, kinship carers, disabled people)
    • Understanding of the issues affecting the representation of disabled people in the workforce in the market, industry or sector relevant to the contract, and in the supplier’s own organisation and those of its key sub-contractors
    • Collection of the views and expertise of disabled people and their representative organisations on successfully supporting disabled employees or applicants
    • Inclusive and accessible recruitment practices, and retention-focused activities, including those provided in the Guide for line managers on recruiting, managing and developing people with a disability or health condition
    • Introducing transparency to pay and reward processes
    • Offering a range of quality opportunities with routes of progression if appropriate, e.g. T Level industry placements, students supported into higher level apprenticeships.
    • Working conditions which promote an inclusive working environment and promote retention and progression
    • Other measures to provide equality of opportunity for disabled people and those with health conditions into employment, including becoming a Disability Confident employer and inclusion of supported businesses in the contract supply chain
    • Understanding of the issues affecting inequality in employment, skills and pay in the market, industry or sector relevant to the contract, and in the supplier’s own organisation and those of its key sub-contractors. Measures to tackle inequality in employment, skills and pay in the contract workforce
    • Inclusive and accessible development practices, including guidance for line managers on recruiting, managing and developing people with a disability or health condition
  • Mission: Break down barriers to opportunity: By reforming our childcare and education systems, to make sure there is no class ceiling on the ambitions of young people in Britain

    Policy Outcome 7: Creating a pipeline of opportunities: For the contract workforce, reducing barriers to entry for under-represented groups.

    • Understanding of the issues affecting the development of new skills by target cohort
    • Understanding of the underlying factors affecting improvements to reduce barriers to entry and training schemes for the target cohort(s) related to the contract workforce
    • Other measures to offer development opportunities for the target cohort(s) in the contract workforce
    • Understanding of issues relating to entering the contract workforce
    • Creation of outreach activities to create a pipeline of employees for the future contract delivery
    • Content of the outreach activity is designed to suit the target cohort
  • Mission: Build an NHS fit for the future: That is there when people need it; with fewer lives lost to the biggest killers; in a fairer Britain, where everyone lives well for longer.

    Policy Outcome 8: Increasing productivity through physical and mental wellbeing: In the supply chain and communities in the relevant area.

    • Understanding of issues relating to health and wellbeing, including physical and mental health, in the contract workforce
    • Understanding barriers to access to health and social care services or employment opportunities e.g. digital inclusion
    • Inclusive and accessible recruitment practices, development practices and retention policies that support-focused activities including those provided in the Guide for line managers on recruiting, managing and developing which support people with a disability or health condition
    • Actions to invest in the physical and mental health and wellbeing of the contract workforce

Service documents

Request an accessible format
If you use assistive technology (such as a screen reader) and need versions of these documents in a more accessible format, email the supplier at psitq@softcat.com. Tell them what format you need. It will help if you say what assistive technology you use.